Roof painting Sydney: preparation first, then the colour

A painted roof looks new for a decade, or peels in two summers. The difference is everything that happens before the paint: pressure cleaning, cracked-tile replacement, repointing and the right primer. Our licensed roofers do the roof work first, repairs, rebedding, repointing, then our qualified painters come in and do what they do best. Roofer first, painter second: that order is the whole job.

Roof leaking right now? Call 1300 304 162 or request urgent help online.

Do we paint roofs in your area?

Enter your suburb or postcode and we'll confirm a licensed roofer covers your area.

Book my roof painting inspection

No contact details needed, and we'll confirm an inspection time when we reply.

“I can't thank Ben from Aussie Roof Repairs enough for his professionalism and honesty while carrying out the repairs to our roof. He explained everything as we went along, and was happy to work in with us…”

Colin H., Google review

Our work and reviews

What roof painting actually involves (done properly)

Roof painting that lasts is a system, not a coat, and the sequence matters. Our painters go up first with the pressure washer, stripping every tile back to a clean, sound surface: gunk, moss, lichen and chalking all gone. Then our licensed roofers do the roof work on that clean surface: cracked tile replacement, ridge capping rebedding, and repointing with proper weep holes. That fresh pointing then needs to dry before any paint goes near it, so the painters come back on a later day for primer and a minimum two to three coats of membrane. Wash, point, dry, paint: it makes a properly done roof a 2 to 3 day job at best. Anyone quoting wash, repoint and paint in a single day is either skipping the roof work or painting over wet pointing, which is why the cheap quotes are cheap.

Why repointing is not a painter's job

Here's the part of roof painting nobody puts in their ads: if the ridge or barge capping needs repointing, and on most Sydney roofs due for painting, it does, that is licensed roofing work, not painting work. Repointing done properly means assessing the bedding underneath, rebedding where it has failed, and applying flexible pointing in controlled beads that seal and hold the capping. Done by someone who doesn't know the trade, it means compound smeared over the top of failed bedding: it looks "done" from the street for a season, then cracks, lifts and lets water straight into the roof. Here's a detail that separates the trades: properly finished ridge pointing includes weep holes. Small breather gaps that let moisture escape from under the capping. Seal a ridge airtight, the way it looks "neatest," and condensation and wind-driven water have nowhere to go: the ridge leaks from the inside. Roofers know this. Painters, almost universally, don't.

The photos below were supplied to us from a job where a roof painter attempted the repointing themselves. To be clear: this is not our work. It's a real example of what we're regularly called out to strip back and redo.

Example of failed ridge repointing attempted by a roof painter: compound smeared over barge capping (not Aussie Roof Repairs work)

Smeared, not pointed. Compound troweled over the capping edge instead of applied in a sealed bead: this is a painter guessing at a roofer's trade.

Hole left through failed repointing on barge capping done by a roof painter (not Aussie Roof Repairs work)

Holes straight through. Gaps and voids left in the pointing: every one of these is a water entry point waiting for the next storm.

Cracked and lifting repointing over roof capping from a painter's attempt (not Aussie Roof Repairs work)

Already failing. Cracking and lifting across the run: this will need to be stripped and redone properly, which costs more than doing it right once.

This is why our painting crew is actually two trades. Our licensed roofers do the roof work first, repairs, ridge capping rebedding and repointing with proper weep holes, and then our qualified painters, who just paint, put the membrane over sound work. Each trade does its own job. If a painting quote doesn't itemise the pointing, ask who's doing it and what licence they hold. You can verify any NSW contractor licence free at verify.licence.nsw.gov.au.

How much does roof painting cost in Sydney?

For a typical Sydney home, professional roof painting lands between $3,500 and $9,000 depending on roof size, pitch, access and how much repair and repointing the preparation stage needs. As a guide: a single-storey 3-bed with a sound roof sits toward the lower half; two-storey homes, steep pitches and roofs needing rebedding push toward the top. A full roof restoration, painting plus the complete repair, rebed and repoint package, typically runs $4,000 to $12,000 and is the better buy when the roof needs more than cosmetics.

Every job is quoted fixed and in writing after a free inspection with photos: the price quoted is the price paid.

Painting vs restoration vs replacement, which do you need?

If your roof is structurally sound and the tiles are just faded or chalky, painting is the right-sized job. If bedding has cracked, tiles have gone porous or valleys are rusting, painting over it wastes money: that roof needs restoration first. And if tiles are delaminating across the roof, no coating saves it: see our honest roof replacement framework. The free inspection tells you which of the three you actually have, with photos.

Colorbond and metal roof painting

Faded or chalking Colorbond and metal roofs repaint well with the right preparation: wash-down, rust treatment on screws and sheet edges, etch primer, then roof-grade membrane. It is a fraction of re-roofing cost and buys years, but rust that has perforated sheets needs metal roof repairs before any paint goes on.

Colours and finish

Modern roof membranes come in the full contemporary range: charcoals, greys, Colorbond-matched tones and heat-reflective formulations that measurably drop summer roof-space temperatures. We bring colour cards to the inspection.

Book My Free Inspection & Quote Call 1300 304 162

Roof painting Sydney: FAQs

Who actually does the work: roofers or painters?

Both, in the right order. Our licensed roofers handle all roof work first: repairs, rebedding, and repointing with proper weep holes so the ridge can breathe. Then our qualified painters, who specialise in painting only, apply the membrane system. Roofer first, painter second.

How long does roof painting take?

Typically 2 to 3 days at best, because the sequence has a drying stage in it: our painters pressure wash first, our licensed roofers then rebed and repoint with weep holes, the fresh pointing must dry, and the painters return to prime and coat. One-day quotes only work by painting over wet pointing or skipping the roof work.

How much does it cost to paint a roof in Sydney?

Most Sydney homes fall between $3,500 and $9,000 depending on size, pitch, access and preparation needed. Painting with full restoration work (rebedding, repointing, tile repairs) runs $4,000 to $12,000. Fixed written quote after a free inspection.

How long does roof painting last?

A properly prepared two-to-three coat membrane system typically performs 10 to 15 years. Preparation is everything: coatings applied over dirty, chalky or unstable surfaces fail in a couple of years.

Can you paint Colorbond and metal roofs?

Yes. Wash-down, rust treatment, etch primer and roof-grade membrane. Sheets rusted through need repair or replacement first, which we will show you in the inspection photos.

Is roof painting worth it, or should I restore or replace?

Painting suits a structurally sound roof that has faded. If bedding or tiles have failed, restoration is the right job; if the roof is at end of life, we will tell you straight and quote the honest option. The free inspection settles it with photos.

Do you use heat-reflective roof paint?

Yes. Heat-reflective membrane options are available and can noticeably reduce roof-space temperatures in summer. Ask at the inspection and we will quote both ways.

Related: roof restoration Sydney · roof replacement · metal roof repairs · tile roof repairs

One real job, start to finish

A leak in Lugarno that an earlier patch hadn't fixed. These are the photos from the job: the same kind of report you get with every free inspection.

What we found
Foil tape and sealant someone else had stuck over the roof tiles
Someone else's earlier patch: foil tape and sealant stuck over the tiles. It hid the leak but didn't stop it.
Roofer pointing to cracked cement bedding under the ridge capping
The real cause: the cement bedding under the ridge capping had cracked and gone to sand.
Roof timber battens rotted through by years of leaking
Underneath: roof battens rotted by years of water getting in.
How we fixed it
New waterproof sarking and new timber battens fitted under the tiles
New waterproof sarking and new timber battens across the affected section, before the tiles went back on.
New gutter and fascia fitted along the eave
A new gutter and fascia along the whole eave.

We fixed the cause, replaced the sarking and battens only where they'd failed, and put in a new gutter line. Read the full story of this job

Book your free roof inspection today

Small roof problems become expensive water damage fast. Book a free inspection and you get a photo report and a fixed written quote, with no obligation.

  • Free inspection with a photo report
  • Fixed written quote, no obligation
  • We reply within 1 business day

Prefer to talk? Call 1300 304 162

We reply within 1 business day.

Having trouble with the form? Open it in a new tab or call 1300 304 162. How we handle your details

Book a free inspection